You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup: • The setup uses a Lean schedule group with a throughput ratio = 2. • The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1. • The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day). • The throughput is 10 per hour. You need to set up a Discrete operation to mirror the item’s production flow activity. What should you do?
Community Votes
100% of anonymous learners picked answer D. Votes are pick records left by other test-takers — they are not the verified answer.
Community Insight
Throughput ratio 2 doubles the per-quantity runtime (3 x 2 = 6 min for process quantity 1); runtime is in minutes so hours/time must be 0.0167.
To convert the Lean production flow activity into a Discrete route, create a route with runtime 6, process quantity 1, and operation hours/time 0.0167 (1 hour/60 minutes).
Keep hours/time at 0.0167 (not 1), and keep runtime 6 for process quantity 1; inverting runtime and quantity yields the wrong route.
Community Discussion (3 comments)
Comments & Corrections
No comments yet — spotted an error or have a note? Share it below.
Expert Analysis
Why the Answer Is Correct
As in the related item, the Lean activity's throughput ratio of 2 doubles the runtime to 6 minutes for process quantity 1. Route runtime is in minutes while the operation hours/time field is in hours, so 1 minute = 1/60 = 0.0167 hour. Option D matches exactly.Why the Other Options Are Wrong
- Option A uses hours/time = 1, treating 6 minutes as 6 hours.
- Option B and Option C use incorrect runtime/process-quantity pairings.