Managing Product Line Setup Without BOM Versioning in MB-330
Short answer
DE Create new raw materials and release to the legal entity, and create new finished goods and release to the legal entity.
Question
Which two actions should Employee1 perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Key Takeaways
The trap lies in assuming product variants can handle the extract differences; however, the prohibition on BOM versioning forces the use of distinct items instead of variants.
Learn why creating separate raw material and finished good items is the correct solution when BOM versioning is disabled in Dynamics 365 Supply Chain Management.
Common mistake: Many candidates choose B and D, assuming 'variants' solve the extract difference. This fails because variants require BOM versioning to associate different components (extracts) with the same base product, which the scenario explicitly forbids.
Expert Analysis
The scenario describes a product line of face creams where each item shares base ingredients but differs by extract (lime, avocado, kiwi). The critical constraint is that the company does not use Bill of Materials (BOM) versioning and must use a single version per item. In Dynamics 365 Supply Chain Management, product variants are typically managed via configuration dimensions and require distinct BOM versions or formulas for each variant to account for different components. Since the prompt explicitly forbids BOM versioning, creating products with predefined variants (Option B) is technically infeasible because you cannot link specific extracts to specific BOMs without versioning.
Therefore, the correct approach is to treat each extract as a separate, independent product entity rather than a variant of a single master product. This requires two distinct actions:
- Create new raw materials: The different extracts (lime, avocado, kiwi) are distinct ingredients. Each needs its own raw material item record to track inventory and costing separately. Option D correctly identifies this need. Option C is incorrect because it suggests adding variants to raw materials, which contradicts the single-version constraint and isn't necessary since the extracts are distinct items, not configurations of one item.
- Create new finished goods: Each face cream type (e.g., Lime Cream, Avocado Cream) is a distinct sellable unit. Since they don't share a single BOM structure through variants, each finished good must be created individually with its own specific BOM linking to the appropriate raw materials. Option E correctly identifies creating new finished goods. Option A is incorrect because it claims raw materials are not required, which is false; production requires raw materials. Option B is incorrect due to the variant/BOM conflict explained above.
Thus, Employee1 must create individual raw material items for the extracts (D) and individual finished good items for each cream type (E).
Official Reference
https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/bill-of-material-bom
This link opens the official vendor documentation in a new tab.
Exam Strategy
When encountering 'single version per item' or 'no BOM versioning', immediately rule out product variants. Variants rely on dimension groups and often require BOM/Formula versioning to map specific component sets to each variant. Instead, design your data model using distinct Item IDs for each unique combination of attributes that affects production or costing.
Frequently Asked Questions
Why can't I use product variants for the different extracts?
What does 'single version per item' mean in this context?
Is it okay to create raw materials without variants?
Community Votes
50% of anonymous learners picked answer D. Votes are pick records left by other test-takers — they are not the verified answer.
Discussion 15 contributions
Compiled from public community threads and reader submissions, lightly edited for clarity. Handles and vote tallies are shown as recorded, and comments reflect the views of individual contributors.
From public community threads 15
-
David92400 👍 5There is not variant for what i saw in the description of the company.
-
Kev_Sharp 👍 3B. Create new finished goods with predefined variants and release to the legal entity. D. Create new raw materials and release to the legal entity. Reason "Each product in the new line uses the same base ingredients but includes a different extract (for example, lime, avocado, kiwi)" this indicates product variant. Product variant is not to be confused with product version from this statement "Use a single version per item.". Review the following for confirmation https://learn.microsoft.com/en-us/dynamics365/supply-chain/pim/product-dimensions#version-dim
-
mondays 👍 3The product could be predefined variants, except production specifies "The company does not use Bill of Materials (BOM) versioning." - this would be required to manufacture product variants. https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/bill-of-material-bom "To relate a specific BOM or formula to a product variant that can be produced, you must create a BOM version or formula version. " Therefore D, E
-
SefaK 👍 3B and D is true
-
TPST 👍 2Best for You Organics plans to introduce a new product line of face creams. Each product in the new line uses the same base ingredients but includes a different extract (for example, lime, avocado, kiwi) => finished good should have variants so B and D as for the Use a single version per item -> there's a product dimension called version, there is nothing to do with this sentence.
Show 10 more comments
-
Mamaou 👍 2As it's "Use a single version per item" it's not a variant.
-
Gemami 👍 1Correct answers: D and E - D. Create new raw materials: Different extracts (lime, avocado, kiwi) are separate ingredients needed for production. - E. Create new finished goods: Each cream can have its own item and BOM, meeting the single-version-per-item requirement. Why not others? - A: Incorrectly excludes raw materials, which are required for production. - B: Predefined variants may require variant-specific BOMs; separate items better fit the simplified BOM setup. - C: Raw materials don't require product variants; separate items are sufficient.
-
H_Incandenza 👍 1I would disagree with that; I would say that what they described is a perfect fit for product variants. I would use a product dimension group with just configuration, and then make the configuration into the extract. However, they expressly say "use a single version per item."
-
patrick364 👍 1Current environment - Best for You Organics plans to introduce a new product line of face creams. Each product in the new line uses the same base ingredients but includes a different extract (for example, lime, avocado, kiwi)
-
CCexamn 👍 1Item model group = Defining costing principles, here FIFO (Answer A) Item group = Defining ledger accounts, here different ledger accounts for RM and FG (Answer E).
-
IlseKH 👍 1you can create a BOM per Product variant, but you dont need to make more versoins of it, the qute about the versions refert to the bom not the product
-
Grabe 👍 1What mean "Use a single version per item"? in my opionion it refers that there is not variant.
-
CCexamn 👍 1Sorry, something must have gone wrong - this reply does not relate to this question...
-
globeearth 👍 1Agreed. it fits with product variants approach
-
Jeddai 👍 1Agree with other comments.
Reader comments & corrections
No reader corrections yet — spotted an error or have a note? Share it below.