Next Step After Identifying Design Issues in Annual Review

Explain the importance of change management processes and the impact to security.

During an annual review of the system design, an engineer identified a few issues with the currently released design. Which of the following should be performed next according to best practices?

  1. Risk management process
  2. Product design process
  3. Design review process
  4. Change control process Correct Answer
Answer Correct answer: D — Initiate the change control process to formally evaluate, approve, and document modifications to the released design.

Community Votes

D
60%
C
40%

60% of anonymous learners picked answer D. Votes are pick records left by other test-takers — they are not the verified answer.

Community Insight

The core trap is confusing the initial identification of issues with the formal process required to modify an already-released asset, which mandates Change Control rather than further review or risk assessment.

This question tests the proper sequence of IT governance processes when flaws are found in a released system design. The correct procedure is to initiate a change control process to formally address and document necessary modifications.

Many learners select 'Design review process' because they assume more analysis is needed first; however, since the design is already released, any modification must go through Change Control.

Community Discussion (17 comments)

RoRoRoYourBoat 👍 11 Selected: D
According to best practices, after identifying issues with the currently released design during an annual review, the next step should be: D. Change control process: The change control process ensures that any modifications to the design are systematically evaluated, approved, and documented. This helps in maintaining the integrity of the system and ensures that changes are implemented in a controlled and coordinated manner.
prabh1251 👍 1 Selected: C
question asks for the immediate next step, C. Design Review Process is the best choice. If the issues have already been analyzed and changes are required, then D. Change Control Process would be the next step.
TmNvrWts 👍 2 Selected: D
GPT mislead me but after some following qs its absolutely D. The engineer found the problems in the designt review so NEXT step is D
Anyio 👍 1 Selected: D
The correct answer is: D. Change control process Explanation: The change control process ensures that any modifications to the system design are properly evaluated, documented, approved, and implemented. After identifying issues with the released design, the change control process provides a structured way to address these issues without introducing unintended risks or disruptions. Other Options: A. Risk management process: Focuses on identifying, assessing, and mitigating risks, but it does not specifically address implementing design changes. B. Product design process: Refers to the overall process of designing the product but doesn’t handle changes to an existing, released design. C. Design review process: Involves evaluating the design for quality and adherence to requirements but does not include implementing or managing changes.
amccert 👍 1 Selected: C
C: Where are you going to look if something is messed up in the process? At the The process that mad it
ramzie 👍 2 Selected: A
The next step that should be performed according to best practices is A. Risk management process. Here's the analysis: Helps evaluate the potential impact of identified issues Determines the severity and urgency of the problems Provides a structured approach to handling discovered design issues why not D Helps evaluate the potential impact of identified issues Determines the severity and urgency of the problems Provides a structured approach to handling discovered design issues Why not C Design Review Process Already completed (annual review identified the issues) Would be redundant at this stage Doesn't address how to handle the identified issues
jbmac 👍 1 Selected: C
The correct answer is: C. Design review process Explanation: When issues with a released system design are identified during an annual review, the design review process should be performed next. This process involves a detailed analysis of the existing design to evaluate the issues, assess possible solutions, and determine necessary changes to improve the design. It's a critical step to ensure that the design remains aligned with the intended goals, performance, and security requirements.
AndyK2 👍 1 Selected: D
The change control process ensures that any identified issues are addressed methodically and with proper oversight. Risk management process: More general, occurs earlier Product design process: Too broad Design review process: Already completed (annual review)
fmeox567 👍 2 Selected: C
The correct answer is: C. Design review process GPT
cyberWoof 👍 1 Selected: C
Design review process
famuza77 👍 2 Selected: C
Change Control Process is for review and register changes on the design process, the question is not even mentioning any change.
01a4c2e 👍 1 Selected: C
C. Design review process - This process allows the team to assess the identified issues in the system design, gather feedback, and determine the necessary changes or improvements. It ensures that all stakeholders are involved in evaluating the design before proceeding further.
PAWarriors 👍 1
Correct answer is C. Design review process. The next step that should be performed according to best practices after identifying issues with the currently released design is the C. Design review process. > In this question the keyword is "Next".
Ty13 👍 2 Selected: C
C. Design Review You still need to evaluate issues and determine if revisions are necessary. If they don't, then that's the end of it. You only need Change Control when you're actually making changes.
dhewa 👍 1 Selected: C
"Next" is the key word here.
EfaChux 👍 3 Selected: D
D. should be the answer since the designed is already release, hence its a change control that will be required.
a4e15bd 👍 1
The design review process allows stakeholders to assess the identified issues and discuss potential solutions and make necessary adjustments.

Comments & Corrections

No comments yet — spotted an error or have a note? Share it below.

Log in to comment, report an error, or add a note about this question.

Submitted for moderation before publishing. Keep it helpful and respectful.

Expert Analysis

Why the Answer Is Correct

The correct answer is D — Change control process. When an engineer identifies issues with a currently released design, the organization cannot simply alter it informally. Best practices dictate that any modification to an approved, released asset must go through the Change Control Process. This ensures that the proposed changes are evaluated, approved, tested, and documented to maintain system integrity and minimize disruption. Since the design is already released, the act of fixing it constitutes a change request.

Why the Other Options Are Wrong

Option A (Risk management) is ongoing but not the immediate procedural step for implementing fixes. Option B (Product design) applies to new development, not modifying existing released systems. Option C (Design review) is typically performed before release to validate the design; while one might argue for another review, the question asks for the next step in addressing the issues in a released product, which triggers the change management workflow. As noted by commenter Ty13, "You only need Change Control when you're actually making changes," implying the identification leads directly to the mechanism for those changes.

Community Comment Notes

The community is split between C and D, with many voting for D based on the keyword "released." User RoRoRoYourBoat correctly points out that "change control... ensures that any modifications... are systematically evaluated." However, users like TmNvrWts admit confusion, noting that "GPT mislead me" towards other options, highlighting the difficulty in distinguishing between iterative review and formal change management in exam scenarios.

Exam Strategy

Always look for keywords indicating the status of the asset. If it is 'released' or 'in production,' any modification requires Change Control. If it were still in development, a Design Review would be appropriate.

Frequently Asked Questions

Why isn't Design Review the answer if we just found issues?

Design Review is typically a pre-release validation step. Once the design is released, any fix becomes a change request governed by Change Control.

Does identifying an issue automatically mean I should start Risk Management?

No. While risk is assessed during change control, the primary procedural requirement for altering a released asset is the Change Control Process itself.

More SY0-701 FAQ →

Related Analysis

Practice All SY0-701 Questions

Access 100 questions with complete answers and detailed explanations.

View Full SY0-701 Practice Test →

← Back to SY0-701 Study Guide