Setting Up a Bill of Materials in D365 SCM
Short answer
BCE Create a new BOM for Site1, add raw materials and approve the BOM version, then activate the BOM.
Question
Which three actions should Employee1 perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Key Takeaways
Even if a company claims 'no BOM versioning,' D365 technically requires a single approved BOM version to be activated for manufacturing to work.
Learn how to correctly configure a Bill of Materials (BOM) in Dynamics 365 Supply Chain Management by creating it for the right site, approving its version, and activating it for production.
Common mistake: Choosing D instead of C: Approving the BOM alone is insufficient; the BOM version must be approved and then activated for production use.
Expert Analysis
The question requires setting up a Bill of Materials (BOM) in Dynamics 365 Supply Chain Management, specifically for a manufacturing context at Site1. The scenario contains a contradictory statement: "The company does not use Bill of Materials (BOM) versioning." However, the technical reality of D365 SCM is that a BOM must have at least one version to be valid and usable for production. Even if versioning is not actively managed (i.e., you don't track multiple versions over time), the system still requires a single active version to link the BOM lines to the item.
Let's evaluate the options:
- E. Create a new BOM for Site1 only: This is the correct starting point. Manufacturing occurs at a specific site, so the BOM must be created for Site1. Stores (Store1, Store2, Store3) are retail locations and do not manufacture products, making option A incorrect.
- C. Add the raw materials to the BOM and approve the BOM version: In D365, after adding lines, you must create and approve a BOM version. This version becomes the active definition for production. While the prompt says "no versioning," this likely means no change management or multiple versions are tracked, but a version record is still technically required and must be approved for the BOM to function. Option D suggests approving just the BOM without a version, which is insufficient because the version is what gets activated.
- B. Activate the BOM: Activation makes the approved version available for production orders. Without activation, the BOM cannot be used in manufacturing. Note: You activate the version, but the option phrasing "Activate the BOM" is commonly accepted in exam contexts to mean activating the current BOM structure/version.
Why C is preferred over D: The BOM itself is a container; the Version is the active entity. Approval of the version is the critical step before activation. Option D implies approving the BOM header/lines directly without referencing the version, which is technically incomplete. Comments highlight this nuance, noting that while the text says "no versioning," the system requires a version. Thus, creating/approving a version (C) and activating it (B) are necessary steps alongside creating the BOM for the correct site (E).
Therefore, the three actions are: Create BOM for Site1 (E), Add materials and approve the version (C), and Activate the BOM/version (B).
Official Reference
https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/bill-of-material-bom
This link opens the official vendor documentation in a new tab.
Exam Strategy
Always verify the scope of the configuration (Site vs. Store) first. Then, recall that D365 Production module relies on BOM Versions as the active transactional object. Even if business processes simplify version tracking, the technical requirement for an approved, active version remains. Look for options that explicitly mention 'version' approval and 'activation'.
Frequently Asked Questions
If the company doesn't use BOM versioning, do I still need to approve a version?
Can I create a BOM for a store location?
What is the difference between approving a BOM and activating a BOM?
Community Votes
34% of anonymous learners picked answer B. Votes are pick records left by other test-takers — they are not the verified answer.
Discussion 10 contributions
Compiled from public community threads and reader submissions, lightly edited for clarity. Handles and vote tallies are shown as recorded, and comments reflect the views of individual contributors.
From public community threads 10
-
Anthony_D 👍 6I think it shoud be BDE, not BCE The case says "The company does not use Bill of Materials (BOM) versioning" And the source says "Note that a BOM version can be approved only if the related BOM itself is approved." So it would not make sense to - Approve the BOM version as the company does not use versioning - Approve the BOM version but not the BOM
-
H_Incandenza 👍 4Another small discrepancy I'm just noticing, please tell me if I'm wrong Both BOM / BOM version can be "approved" but only the BOM version (not the BOM) can be activated. I still think B is right, but it just goes to show how sloppy these questions are.
-
SimonB 👍 3In order to assign an item to a BOM, you always have a BOM version. BOM versioning would indicate that as you update or change requirements in the BOM a new version would be created. Answer is correct
-
H_Incandenza 👍 2This, clearly when they said "the company does not use BOM Versioning" they had something else in mind. To my knowledge, you MUST MUST MUST have both a BOM and a BOM version; the latter is what relates the BOM to the item.
-
AntoonvM 👍 2The text is misleading. D365 requires a version. Even if you do not want to use versions.
Show 5 more comments
-
Gemami 👍 1Correct answers: B, C, E - B. Activate the BOM: Makes the approved BOM version available for production and planning. - C. Add raw materials and approve the BOM version: Approval of the version is required before activation. - E. Create a BOM for Site1 only: Manufacturing occurs at Site1. Why not others? - A: Retail stores don't manufacture products. - D: Approving the BOM alone doesn't approve its BOM version.
-
H_Incandenza 👍 1SimonB stated above: they have to mean something else because you MUST use a BOM version, and the BOM version must be active. They might be referring to something along the lines of engineering change management? I don't know.
-
Kev_Sharp 👍 1B. Activate the BOM. C. Add the raw materials to the BOM and approve the BOM version. E. Create a new BOM for Site1 only. https://learn.microsoft.com/en-us/dynamics365/supply-chain/production-control/bill-of-material-bom
-
Tonyburg 👍 1How can that be C when they say "The company does not use Bill of Materials (BOM) versioning"?
-
75a0975 👍 1This is correct
Reader comments & corrections
No reader corrections yet — spotted an error or have a note? Share it below.