2V0-15.25 VMware Cloud Foundation 9.0 Support exam badge

VMware

VMware Cloud Foundation 9.0 Support (2V0-15.25) practice questions

★★★★★★ 4.8 41 reviews — aggregated from community votes by visitors who practiced this bank

Questions
115
Exam length
135 min
Passing score
300
  • Instant feedback per question
  • Explanation for every option
  • Free, no signup

Exam overview 2V0-15.25

When an SDDC Manager upgrade plan refuses to move a 5.x management domain straight to VCF 9.0, the support engineer holding the ticket has minutes, not a lab. 2V0-15.25, the VMware Cloud Foundation 9.0 Support exam, is built for that moment: Broadcom scores 60 items across 135 minutes, sets the pass mark at 300 on a 100-500 scale, and frames every item as a support decision rather than a feature description. Passing leads to the VMware Certified Professional – VMware Cloud Foundation Support credential, VCP-VCF Support for short.

Broadcom's candidate profile asks for about two years in IT and one year supporting VCF components, and that second year is where the real work happens. These are people who answer escalation queues from a service desk, staff an operations centre, or carry an SRE pager for a private cloud. They already know what a workload domain is. What the paper probes is whether they can separate an NSX transport-node failure from a vSAN placement problem when both surface as one unreachable application.

The tested work sits in the support portion of the guide, and it is unglamorous by design: a bundle that must be collected before anyone reboots anything, a Log Assist upload that has to land on the right service request, a custom alert that stays silent until the effective policy enables it. Expect SDDC Manager lifecycle failures where the planner insists on an intermediate release, VCF Operations health questions where the symptom is valid but nothing fires, VCF Operations for Logs searches that quietly miss a single host, vSAN and NSX faults whose evidence lives in a log rather than a dashboard, and certificate or Identity Broker problems that only appear as an authentication failure hours later.

Practice sets here follow the order an incident actually unfolds. A question may open with an esxtop view showing 15 percent ready time, or with a six-host vSAN cluster whose RAID-6 request was rejected, and the explanation then walks the evidence chain instead of reciting a command. Because every online practice question carries a detailed answer explanation, a timed run reveals which reflex is still weak — collect first, or act first — well before test day.

Begin with the free questions and note which incidents you misread.

Sample questions 12 of 115 shown

  1. Q1
    An administrator has received reports of high CPU ready times on several Virtual Machines (VMs) running within a VMware Cloud Foundation (VCF) workload domain and has been tasked with collecting detailed metrics for all running Virtual Machines from each ESX host. Which command line utility will enable the administrator to collect the required metrics?
    1. vim-cmd
    2. vimtop
    3. esxcli
    4. esxtop
    esxtop is the interactive performance-monitoring utility that reports per-VM and per-host CPU, memory, disk and network counters (including CPU ready time). Running esxtop -b produces a batch/CSV-style output that can be used to collect detailed per-VM metrics from each host. vim-cmd, vimtop and esxcli do not expose the granular per-VM performance counters needed here.
  2. Q2
    An administrator recently deployed a new three-node VMware vSAN Express Storage Architecture (ESA) cluster to an existing workload domain. After creating a number of Virtual Machines (VMs), the administrator discovers that storage is being consumed a lot quicker than expected. While investigating the issue, the administrator discovers that the datastore default policy has been set to RAID-1 by Auto-Policy Management rather than the expected RAID-5. What is a possible cause?
    1. The vSAN storage policy has Force Provisioning enabled.
    2. The vSAN ESA cluster has Host Rebuild Reserved enabled.
    3. The vSAN ESA cluster must have a minimum of four hosts.
    4. The RAID-5 policy is only supported on a vSAN ESA storage cluster.
    vSAN ESA RAID-5/RAID-6 erasure coding requires a larger minimum host count than a three-node cluster provides (ESA RAID-5 needs at least six hosts). Because the cluster is below that threshold, Auto-Policy Management falls back to RAID-1 (mirroring), which consumes roughly twice the raw capacity per object and explains the rapid space consumption.
  3. Q3
    An administrator is preparing to upgrade their VMware Cloud Foundation (VCF) management domain from VCF 5.0 to VCF 9.0. After configuring the online depot, they see the SDDC Manager 9.0 upgrade bundle is available. However, the 9.0 upgrade bundles for vCenter, ESX, and NSX are missing. How can the administrator resolve this issue?
    1. Upgrade the SDDC Manager to 9.0.
    2. Use the VCF Download Tool to download the missing 9.0 upgrade bundles.
    3. Upgrade the management domain from VCF 5.0 to VCF 5.2.
    4. Use the VCF Offline Bundle Transfer Utility (OBTU) to download the missing 9.0 upgrade bundles.
    When the online depot exposes the SDDC Manager bundle but not the component (vCenter/ESX/NSX) bundles, the VCF Download Tool is used to pull the missing bundles from the configured depot. OBTU is intended for offline/air-gapped transfer, and simply upgrading SDDC Manager or the domain does not populate the component bundles.
  4. Q4
    An administrator has a vSphere 8.0 Update 3 environment with the following configuration: a 3-node vSAN cluster, a vSphere Standard Switch (VSS), and several standalone ESX hosts in the vCenter inventory. They want to convert this vSphere environment into a new VMware Cloud Foundation (VCF) 9.0 management domain. Identify two changes they will need to make before converting this vSphere environment into a VCF management domain. (Choose two.)
    1. Remove the vSphere Standard Switch from the vCenter inventory.
    2. Upgrade vSphere 8.0 Update 3 to vSphere 9.0.
    3. Configure a vSphere Distributed Switch.
    4. Remove the standalone hosts from the vCenter inventory.
    VCF 9.0 is built on the vSphere 9.0 bill of materials, so ESXi/vCenter must be upgraded to 9.0 before conversion. VCF management domains also require a vSphere Distributed Switch (VDS) for management, vSAN and vMotion traffic — a Standard Switch is not supported, so it must be replaced by a VDS. Removing standalone hosts or removing the VSS from inventory is not a required prerequisite.
  5. Q5
    An administrator is responsible for supporting a VMware Cloud Foundation (VCF) fleet and has been tasked with deploying VMware Cloud Foundation (VCF) Operations for Logs. To complete this task, the administrator needs to configure a new offline depot within VCF Operations fleet management. The following information has been provided: Offline Depot Type: Webserver; Repository URL: http://10.138.148.160/depot/; Username: depotuser; Password: P@sswordl23!; Accept imported certificate: True. When the administrator attempts to configure the depot, the following error message is presented: "Either the depot URL provided is partial or invalid or not reachable or download token is invalid." The administrator confirms the repository URL is valid via a web browser and that the downloaded folder and files were copied into the /depot shared folder on the web server hosting the repository. Which two actions must the administrator take to resolve the issue? (Choose two.)
    1. Reconfigure the web server to share the /vcf/ folder containing the depot files.
    2. When configuring the offline depot, the Repository URL should be changed to http://10.138.148.160.
    3. When configuring the offline depot, the OfflineDepotType should be changed to Local Path.
    4. Reconfigure the Fleet Manager appliance to share the /data/ folder.
    5. When configuring the offline depot, the Repository URL should be changed to https://10.138.148.160/depot/.
    The VCF Operations for Logs offline depot expects the webserver to serve the depot content from the /vcf/ folder and to be reached over HTTPS with a trusted certificate. Sharing the correct /vcf/ folder and switching the repository URL to https:// addresses both the path mismatch and the transport requirement that produce the "partial or invalid" error. (Note: source answers on this item vary; confidence is moderate.)
  6. Q6
    An administrator created a new VPC with an associated subnet, configured with a DHCP Server. When attaching virtual machines to the VPC subnet, an IP address is assigned, but the DNS and NTP settings are not configured. How can the administrator update the DHCP server configuration to set DNS and NTP?
    1. Enable DNS and NTP Passthrough on the DHCP Server.
    2. Update the default VPC Service Profile to include the IP addresses for the DNS and NTP servers.
    3. Switch the DHCP Network mode from Distributed Connectivity to Centralized Connectivity.
    4. Change the DHCP Server mode from DHCP Server to DHCP Relay.
    In VCF Networking VPC, DHCP options such as DNS and NTP servers are supplied through the VPC Service Profile. Updating the default VPC Service Profile with the DNS and NTP server IP addresses causes the DHCP server to hand those options to guest VMs.
  7. Q7
    An administrator is creating a new workload domain from VMware Cloud Foundation (VCF) Operations. They are blocked at the Hosts selection screen as no ESX hosts are available. They see the following message: "No suitable hosts available to create a VI workload domain. Hosts must be unassigned, commissioned with at least one physical NIC and the same storage type as the VI workload domain, and the ESX version must be compatible with the lowest ESX version present in the management domain." How can the administrator commission new hosts to enable the creation of the VI workload domain?
    1. Using the Cloud Builder.
    2. Using the vSphere client.
    3. Using the VCF Installer.
    4. Using VCF Operations.
    In VCF 9.0, host commissioning for a new workload domain is performed in VCF Operations (workload/fleet management). Hosts must be unassigned, have at least one physical NIC, match the workload domain's storage type, and run an ESX version compatible with the management domain before they become selectable.
  8. Q8
    An administrator wants to expand a VMware vSAN cluster in a workload domain by adding an unassigned host from the vSphere client. However, at the Host Selection screen no hosts are available and the following message is displayed: "No unassigned hosts available with storage type VSAN. Commission hosts with physical NICs 0 & 1 to Add Host from UI." How can the administrator commission hosts?
    1. From the vSphere client by navigating to Supervisor Management.
    2. From VCF Operations by navigating to Fleet Management.
    3. From the SDDC Manager by navigating to Workload Domains.
    4. From the vSphere client by navigating to the Global Inventory.
    For expanding an existing workload domain, host commissioning is performed in SDDC Manager under Workload Domains → (select domain) → Hosts → Commission Hosts. This validates hardware, storage type (vSAN ESA/OSA) and NIC placement; only then does the host appear in the vSphere Client "Add Host" wizard. The vSphere Client and Global Inventory do not perform this commissioning workflow.
  9. Q9
    An administrator is responsible for managing a VMware Cloud Foundation (VCF) fleet configured as follows: single VCF instance with a single workload domain; the workload domain has a single 5-node vSAN Express Storage Architecture (ESA) cluster; the vSAN Default Storage Policy is RAID-1. Storage capacity is running low, and to improve space efficiency the administrator attempts to change the vSAN storage policy on a number of large virtual machines to a 2 Failures - RAID-6 policy. The policy change is immediately rejected. What should the administrator do to reduce overall capacity usage while waiting for new storage devices to arrive?
    1. Enable encryption on the vSAN Default Storage Policy.
    2. Reconfigure the Virtual Machines to use a 1 Failure-RAID-5 Storage Policy.
    3. Convert the Virtual Machines from thick provisioning to thin provisioning.
    4. Enable compression on the vSAN Default Storage Policy.
    In vSAN ESA, RAID-6 requires at least seven hosts and RAID-5 requires at least six hosts, so neither erasure-coded policy can be applied on a 5-node cluster. The safe way to reclaim space without adding hosts is to convert thick-provisioned VMs to thin provisioning so unused blocks are released. Encryption/compression do not retroactively free capacity.
  10. Q10
    An administrator is responsible for managing a VMware Cloud Foundation (VCF) fleet. The administrator discovers intermittent performance issues with the supplemental storage (iSCSI) connected to a VCF workload domain. The iSCSI target is reachable from most ESX hosts, but some hosts consistently experience periods of slow I/O and connection drops. Which two actions should the administrator take to diagnose and resolve this issue? (Choose two.)
    1. Review the iSCSI target's configuration to ensure it's configured for maximum performance, including enabling CHAP authentication.
    2. Examine the iSCSI VMkernel port on all affected ESX hosts for TCP retransmissions and checksum offload errors.
    3. Update the network plugin on the ESX host to the latest version.
    4. Ensure all ESX hosts have the VMkernel port MTU set to 1500.
    5. Ensure all ESX hosts have the VMkernel port MTU set to 9000.
    Intermittent slow I/O and connection drops on only some hosts point to network-layer inconsistency. Examine the iSCSI VMkernel adapters for TCP retransmissions and checksum offload errors, and ensure jumbo frames (MTU 9000) are configured consistently end-to-end; an MTU mismatch causes large frames to be dropped. MTU 1500 would defeat a jumbo-frame design, and CHAP/plugin updates are not the first diagnostic steps.
  11. Q11
    An administrator is adding a vSphere Supervisor using VMware NSX classic to an existing VMware Cloud Foundation (VCF) cluster using Distributed Connectivity. When attempting to enable the vSphere Supervisor for the domain the cluster shows up as incompatible with the reason: "No valid edge cluster for VDS 50 0b 4d 9a cb 32 62 4d - 76 78 6b 92 cd 87 c4 5a". Why is the cluster showing up as incompatible?
    1. The WCPReady tag has not been assigned to the NSX Edge Cluster.
    2. The NSX Edge transport nodes have been deployed as large.
    3. vSphere Supervisor requires Central Connectivity.
    4. AVI load balancing has not been enabled for the NSX Edge Cluster.
    vSphere Supervisor (Workload Management) filters the list of usable NSX Edge Clusters by a case-sensitive WCPReady tag on the Edge Cluster object. If the tag is missing (common when the Edge Cluster was created manually rather than via automation), validation fails with "No valid edge cluster for VDS." Adding the WCPReady tag to the NSX Edge Cluster resolves it.
  12. Q12
    An administrator attempts to add a new user (provideradmin05) within the VMware Cloud Foundation (VCF) Automation Provider Management Portal, however provideradmin05 cannot be found for import. The following information is provided: the VCF fleet uses VMware Identity Broker (VIDB) for single sign-on; VIDB uses Active Directory as the identity provider; a group named VCFA_ProviderAdmins was created in Active Directory, populated with the appropriate accounts and synchronized with VIDB; five days later provideradmin05 was added to VCFA_ProviderAdmins. What will resolve this issue?
    1. In VCF Operations, manually resync the directory.
    2. In the VCF Automation Provider Management Portal, enable the Advanced Rights Bundle Mode.
    3. In VCF Operations, disable VCF SSO for VCF Automation.
    4. In the VCF Automation Provider Management Portal, import provideradmin05 as an LDAP user.
    The user was added to the AD group after the last directory synchronization, so the identity source has not yet picked up the new membership. Manually resynchronizing the directory in VCF Operations forces VIDB/VCF Automation to re-read group membership so provideradmin05 becomes available for import.

Answer all 115 questions with instant feedback →

Reader reviews 41 ratings

4.8 ★★★★★★ Based on 41 ratings
  • The 2V0-15.25 practice exam was crucial to my success. The domains map perfectly to the official exam blueprint.

    ★★★★★★ Jennifer F.

  • The way the 2V0-15.25 questions are broken down by domain is great. Let me focus on my weak spots without wasting time.

    ★★★★★★ Olivia H.

  • I travel a lot for work, so the mobile-friendly 2V0-15.25 practice was a lifesaver. Did questions on flights and during commute.

    ★★★★★★ Lily B.

  • First time using online prep for a certification. The 2V0-15.25 questions were clear, accurate, and well worth the price.

    ★★★★★★ Abigail M.

  • Got the 2V0-15.25 certification after three weeks of self-study with this question bank. Very happy with the purchase.

    ★★★★★★ Victoria K.

  • I’ve purchased a few VMware exam dumps over the years and this 2V0-15.25 one is easily the best quality.

    ★★★★★★ Samuel T.

Log in to rate this exam and leave a review.

Frequently asked questions

Do the 2V0-15.25 practice questions cover SDDC Manager upgrade failures the way the exam does?

They do, and upgrade planning is one of the bank's heaviest threads. Items hand you a planner that rejects a direct 5.x to 9.0 jump, a depot exposing the SDDC Manager bundle while vCenter, ESX and NSX bundles are missing, and an Add Host precheck blocked by a vLCM image mismatch. Explanations name the tool that clears each gate.

How hard is the 2V0-15.25 exam?

Expect a professional-level paper that assumes you have repaired a fleet, not only deployed one. Its difficulty is breadth: one item sits in vSAN placement, the next in NSX transport nodes, a third in Identity Broker Kerberos, so depth in a single component will not carry you. A year of real support work makes it demanding but fair.

What does a passing score of 300 actually mean?

It is a scaled score on a 100 to 500 range, not a percentage and not a count of correct answers. Broadcom scales and weights items, so converting 300 into "you may miss twelve questions" does not work. Read practice accuracy as a trend across topics, never as a predicted result.

Which evidence should you collect first when an ESXi host drops out of vCenter?

Check the agent before rebooting anything: a stopped vpxa explains a disconnected host whose virtual machines keep running, and restarting it costs no downtime. If the host is instead logging nmlx5 health alerts, or dfwpktlogs is flooding syslog, the evidence points elsewhere. Preserve the bundle before changing state.

Should you take the Support exam or the Administrator exam first?

Take Administrator first if you have never built or commissioned a workload domain, because support scenarios assume you recognise normal behaviour. The two papers share a platform but test different jobs: 2V0-17.25 asks how to configure, 2V0-15.25 asks why it broke. Neither is a formal prerequisite for the other.

How long must you wait before retaking 2V0-15.25?

Seven days from the failed attempt, and there is no discounted retake, so budget the standard USD 250 again unless you hold a voucher. Spend the gap on the evidence chain rather than another full run; the second paper will not repeat the items you just saw.

Is a mock exam useful for the esxtop and vSAN questions?

Yes, provided you read every explanation instead of chasing the percentage. A timed mock exam shows whether you reach for %RDY, MCTLSZ or DAVG when a virtual machine is slow, and whether you know a six-host ESA cluster still cannot accept RAID-6. Those reflexes are what gets scored.