How to Lift and Shift On-Premises VMs to AWS Quickly?
Short answer
BCD Install the AWS Replication Agent for Application Migration Service, test the replicated VMs, then launch cutover instances.
Question
Key Takeaways
The question tests whether you can map a lift-and-shift VM migration to the MGN workflow (agent, initial replication plus test launch, cutover) rather than the trap of picking AWS SCT or App2Container simply because they also carry the AWS migration label.
A time-sensitive lift-and-shift migration of on-premises VM workloads to AWS is executed with AWS Application Migration Service, not database or container tooling. This page confirms that the three required steps are installing the AWS Replication Agent, validating replicated VMs with test instances, and cutting over after stopping source operations (B, C, D).
Common mistake: The most common wrong pick is option A (AWS Schema Conversion Tool), because candidates recognize the name as an AWS migration tool and assume it 'collects data about the VMs'; in reality SCT converts database schemas and engines, which is exactly the re-platforming work a lift-and-shift strategy avoids, while option E (App2Container) wrongly containerizes the workload instead of replicating the VM.
Expert Analysis
Why the Answer Is Correct
Option B names the purpose-built service for lift-and-shift: AWS Application Migration Service (MGN) replicates source servers block-level into a staging area in your AWS account, and the AWS Replication Agent is what you install on each source VM to start that replication. Option C describes the validation stage of the MGN lifecycle: once the initial replication reaches a healthy state, you launch test instances and run acceptance tests while the production VM keeps serving traffic, so problems are found before any outage. Option D describes cutover: you stop writes on the source VM so the last delta can be replicated, then launch the cutover instance, which MGN has already converted to boot natively as an EC2 instance. Together B, C and D form the complete agent-install, replicate-and-test, cut-over sequence for a fast, minimally modified migration.
Why the Other Options Are Wrong
Option A is a distractor built on tool-name recognition: AWS Schema Conversion Tool exists to convert source database schemas, stored procedures and code to a target engine, which is re-platforming or refactoring rather than the requested lift-and-shift of whole VMs. Option E is the containerization distractor: App2Container discovers.NET and Java applications and repackages them into containers for ECS or EKS, adding an application-modernization project that directly conflicts with a time-sensitive migration and with the goal of minimal modification. Neither tool collects VM-level information for replication, so both would leave the company without the block-level data MGN needs.
Community Comment Notes
All 100 recorded votes land on B, C, D, and the comment thread is unusually consistent in explaining why. LeonSauveterre frames the concept plainly — "Lift-and-shift means replicating on-premises workloads to AWS" — and adds that "A cutover instance is used to direct traffic away from the source region", which matches the stop-operations-then-cutover step in option D. JA2018 walks through the same mapping option by option, calling MGN "the primary tool for a lift-and-shift migration strategy" and stressing that acceptance tests are run on test instances after initial replication, while aragon_saa simply concurs with B, C, D. The practical takeaway from the thread is that the confusing part is only the wording, not the technology.
Official Reference
- https://docs.aws.amazon.com/application-migration-service/latest/userguide/what-is-service.html
- https://docs.aws.amazon.com/application-migration-service/latest/userguide/agent-installation.html
These links open the official vendor documentation in a new tab.
Exam Strategy
On SAA-C03 multi-select migration questions, first classify the strategy asked for (rehost, replatform, refactor) before looking at the options; any option that converts schemas (SCT) or containerizes apps (App2Container) is refactoring/replatforming and can be eliminated immediately when the stem says lift-and-shift. Then keep the three options that follow the replication lifecycle order: install agent, replicate and test, then cut over.
Frequently Asked Questions
Why is AWS Schema Conversion Tool (option A) wrong for a lift-and-shift VM migration?
Do you really have to stop operations on the VMs before cutover?
Community Votes
100% of anonymous learners picked answer BCD. Votes are pick records left by other test-takers — they are not the verified answer.
Discussion 3 contributions
Compiled from public community threads and reader submissions, lightly edited for clarity. Handles and vote tallies are shown as recorded, and comments reflect the views of individual contributors.
From public community threads 3
-
LeonSauveterre 👍 4Well this is new. Never seen a question like that before. WHAT YOU SHOULD KNOW: 1. Lift-and-shift means replicating on-premises workloads to AWS with minimal modifications. 2. A cutover instance is used to direct traffic away from the source region and to the workload in the target region.
-
JA2018 👍 2Why I will choose Options B, C & D: #B: AWS Application Migration Service (AWS Migration Service) is the primary tool for a lift-and-shift migration strategy, allowing you to easily replicate on-premises VMs to AWS by installing the Replication Agent on the VMs. #C: Complete initial replication and launch test instances: After the initial replication of VMs to AWS, it's crucial to perform acceptance tests on the newly migrated instances to ensure functionality before fully transitioning. #D: Stop operations and launch a cutover instance: For a cutover migration, you would stop operations on the on-premises VMs and then launch the migrated instances on AWS to switch over completely
-
aragon_saa 👍 2Answer is BCD
Reader comments & corrections
No reader corrections yet — spotted an error or have a note? Share it below.
Related Analysis
Practice All SAA-C03 Questions
Access 120 questions with complete answers and detailed explanations.
View Full SAA-C03 Practice Test →