Which Documentation Do You Need to Set Up New Switches Properly?
A network administrator is preparing new switches that will be deployed to support a network extension project. The lead network engineer has already provided documentation to ensure the switches are set up properly. Which of the following did the engineer most likely provide?
Community Votes
67% of anonymous learners picked answer C. Votes are pick records left by other test-takers — they are not the verified answer.
Community Insight
The exam tests the purpose of a baseline configuration as a documented reference for configuring new devices consistently, and the common trap is to confuse this with a logical network diagram, which describes Layer 3 design rather than actual switch configuration.
For the Network+ N10-008 question about preparing new switches, the community voted for Baseline configurations with 67% support. Baseline configurations are standard reference settings used to provision new devices consistently, while diagrams describe network design rather than device setup.
Many candidates chose D, Logical network diagram, because a logical diagram helps visualize network structure; however, it does not contain the standard settings needed to set up a new switch, whereas a baseline configuration is exactly the reference document used for provisioning.
Community Discussion (6 comments)
Comments & Corrections
No comments yet — spotted an error or have a note? Share it below.
Expert Analysis
Why the Answer Is Correct
When new switches are deployed for a network extension, the engineer needs to ensure each switch is provisioned identically and according to policy. Baseline configurations are reference configurations that contain the expected settings such as VLANs, spanning-tree, security, management, and other operational parameters for network devices. The wording 'to ensure the switches are set up properly' aligns directly with the purpose of a baseline, as comments [2] and [4] explain. This is why C is the strongest choice and why it received 67% of the votes.Why the Other Options Are Wrong
A physical network diagram shows cabling, ports, and physical device placement, but it does not contain the software or configuration details needed to set up a switch. Site survey reports are aimed at wireless coverage and are irrelevant when deploying wired switches. D, the logical network diagram, is often chosen because it shows IP addressing, VLANs, and routing, but as comments [3] and [4] note, logical diagrams are Layer 3-focused and do not provide the standard configuration a switch needs to be set up properly. Thus, D is conceptually related but is not the documentation that defines device setup.Community Comment Notes
The community split between C and D, with C winning 67% to 33%. Comment [2] correctly describes baseline configurations as standard or reference configurations used for consistency, and comment [3] points out that logical network diagrams are a Layer 3 concept while a switch configuration is typically Layer 2 unless it is a Layer 3 switch. Comment [1] makes a point that baseline performance cannot be measured on an inactive switch, but that argument misreads the term baseline configuration: it is not a performance baseline but a configuration baseline. Comments [5] and [6] reinforce the consensus for C, making baseline configurations the clear answer.Official Reference
Exam Strategy
Focus on what the action 'set up properly' demands. Baseline configurations are the gold standard for consistent device provisioning, while diagrams support architecture, documentation, and troubleshooting but do not provide the actual device settings. In similar questions, distinguish between a configuration baseline and a performance baseline.